
Client Impact / Clients & References
Trusted in demanding industrial environments.
Our strongest reference is the confidence to return, extend an assignment and recommend us to others. We build that trust through relevance, integrity and delivery.
Relationships before transactions
A partner close enough to understand and experienced enough to challenge
EcoNordic supports organisations in automotive, manufacturing, engineering, technology, life science, infrastructure and the public sector.
Our references include assignments delivered by EcoNordic, formerly InnovationTech, and experience carried by the senior consultants in our network. The common thread is practical change in complex organisations.
Selected references
Experience across industrial value chains
A selection of organisations represented in our collective delivery experience.

Heavy vehicles, buses and industrial power solutions.

Modular sealing solutions for critical infrastructure.

Global engineering group serving industry and infrastructure.

Global access solutions and entrance systems.

Global biopharmaceutical innovation and manufacturing.

Automotive propulsion and electrification technology.

Advanced separation technology for heavy-duty vehicles.

Industrial contract manufacturing and engineering.

Injection-moulded components for demanding applications.

Swedish kitchens, bathrooms and storage solutions.

Electric heating solutions and industrial components.

Advanced copper wire and solutions for industry.
Logos are shown as references to organisations represented in EcoNordic’s or our consultants’ delivery experience. Specific assignment details may be confidential.
Results from previous assignments
Manufacturing improvement and supply chain in practice
These examples draw on assignments delivered by our business, including under its former name InnovationTech. Customer names are anonymised. Results relate to individual assignments and do not predict outcomes for other operations.
OEE from 40 to 60 percent in three months
A UK manufacturing operation faced recurring production losses. Practical improvement work increased overall equipment effectiveness, OEE, from 40 to 60 percent during the first three months.
What the change means: An increase of 20 percentage points in OEE represents a 50 percent relative improvement. With unchanged planned production time and other conditions, this corresponds to 50 percent more effective production capacity.
Read the full case studyOn-time delivery reached 98 percent within six months
An automotive supplier had an on-time delivery rate just below 60 percent. The assignment addressed planning processes, parameters and data in the production planning system. Within six months, delivery performance reached 98 percent, alongside more effective planning and a calmer working environment.
Illustrative calculation: For 1,000 deliveries, an improvement from 60 to 98 percent reduces late deliveries from 400 to 20. That means 380 fewer late deliveries, without assuming a financial value.
Read the full case studyFrom around 200 to over 3,000 parts per week
For an industrial project under delivery pressure, we brought together consultants in quality, production, planning, project management, purchasing and engineering. Weekly output rose from around 200 to over 3,000 parts in twelve weeks.
Coordinated delivery: The assignment illustrates the value of combining specialist disciplines around a shared delivery goal. The volume increase describes this project and is not a general productivity guarantee.
Read the full case studyWhat clients can expect
A consistent way of working across every assignment
- 01
Relevance
We understand the context before proposing the solution.
- 02
Integrity
We are clear about evidence, limitations and what the work requires.
- 03
Ownership
We stay close to decisions, delivery and emerging risk.
- 04
Impact
We connect our contribution to measurable operational value.
Start a conversation
Let the next reference be yours.
Share the situation, desired outcome and urgency. We will bring the right combination of challenge and support.